This measure is related to the overhaul of the runway
The new air route will join the list of 42 direct destinations available from Almaty
This measure aims to stimulate cargo flows and develop the national transport infrastructure
The UAE investor will assume operational management of the airport in the future
Passengers are advised to check the flight status in advance
The current terminal will be designated for domestic flights
Turkish S Sistem Lojistik plans to build a cargo and container terminal
The airport expansion plan will be a long term project
Check-in for domestic destinations remains the same
The Regional Department of Passenger Transport and Highways reported on the construction plans
Operating hours will be limited due to repairs